Commercial · Industrial · Government roof protection

When the roof fails, we seal the building.

Titanium Tarps fits temporary Elastowrap coverings to commercial roofs left open by storm damage, fire or a delayed reroof. Explore the projects, see how the system works and contact the field team.

Church roof · original tile and completed white cover before the coveringChurch roof · original tile and completed white cover with the coveringAfterBefore
Church roof · original tile and completed white cover
  • Coast Guard facility · Florida
  • Shell warehouse · Houma
  • Recycling plant · Gulf Coast
  • Long-lead tile reroof
  • Church and school campus · New Orleans
  • Federal scaffold enclosure
  • Floating atrium barrier · Miami
  • Waterfront condominiums
  • Stadium enclosure · Miami
  • Blue tarps and sandbags

The blue tarp problem

An open roof can outlast a temporary tarp.

Repeated patching, loose edges, exposed seams and tie-down or sandbag loads can complicate a long restoration.

Wind and attachment
Plan the perimeter and attachment method for the actual structure and expected exposure.
Roof penetrations
Review the deck, fascia, drains and openings before choosing a detail.
UV exposure
Match the material and inspection schedule to the expected reroof timeline.
Fire performance
Obtain the current test documentation for the material and assembly specified.
Six-building apartment property before the coveringSix-building apartment property with the coveringAfterBefore
Six-building apartment property

What we do

Commercial roof protection, at any scale.

From a warehouse to an occupied campus, the team scopes access, existing roof conditions, material, installation and documentation together.

Crew fitting a temporary membrane at a waterfront building

Emergency commercial roof tarping

Temporary coverings after hurricanes, hail, wind and fire. The team scopes the opening and access before mobilization.

Houma warehouse before temporary coveringBefore

Stretch wrap roofing for large roofs

Elastowrap film spans large roof areas on warehouses, plants and institutional buildings.

Historic building with a temporary roof covering

Failing tile and long-lead roofs

Plan temporary protection while replacement Ludowici, slate, clay or custom tile is sourced.

Two covered facility roofs near a flagpole

Government and institutional

Temporary protection for facility repairs and delayed reroofs, with project photography for procurement teams.

See the federal project
Aerial view of a campus with covered buildings

Disaster recovery and large loss

Coordinate multi-building work for school and church campuses, institutions and property portfolios.

Concept rendering of membrane enclosure on a tower under construction

Construction and high-rise enclosure

Weather enclosure for open floors and delayed glazing. The illustration shows an example floor-level enclosure.

Meet the construction division

Scroll to Cover 2.0 · Technology demonstration

See a roof cover take shape.

Move from damaged tile to a fitted covering. Scroll through the installation, or use the slider, house rotation and roof layers to inspect each stage.

Before and after

From damage to a fitted covering.

Drag a handle or use its arrow keys to compare photographs from the same project.

Historic church after storm damage before the coveringHistoric church after storm damage with the coveringAfterBefore
Historic church after storm damage
Gulf Coast recycling plant before the coveringGulf Coast recycling plant with the coveringAfterBefore
Gulf Coast recycling plant
Louisiana restaurant during reconstruction before the coveringLouisiana restaurant during reconstruction with the coveringAfterBefore
Louisiana restaurant during reconstruction
Multifamily property after a roof fire before the coveringMultifamily property after a roof fire with the coveringAfterBefore
Multifamily property after a roof fire

Field sequence · Houma, Louisiana

One warehouse. Three stages.

Inspect the existing roof and establish the work area.

Houma warehouse before temporary covering
Before · Houma shell warehouse

The membrane · Elastowrap

Specify the film for the building.

These are the six material and installation questions to review with the project team before choosing a system.

Gauge

Confirm film thickness and the lot-specific product sheet.

Wind exposure

Review the tested assembly, substrate and site conditions.

Fire classification

Ask for the applicable surface-burning test and its scope.

UV exposure

Check the exposure rating, inspection interval and written terms.

Attachment

Establish how the system will connect to this particular structure.

Surface traction

Confirm the access plan and current material test data.

Product line

Elastowrap film and the Titan attachment system.

The covering, seam materials, vents and perimeter hardware work as a specified assembly.

Temporary membrane enclosing a scaffolded structure

Elastowrap Stretch Roof Film

Stretch film fitted and tensioned across a commercial roof. The project catalog lists 20 × 100, 32 × 90, 32 × 70 and 40 × 60 roll formats. Confirm units, current sizes and availability with the team.

Request Elastowrap pricing
TitanBond Seam Tape catalog illustration

TitanBond Seam Tape

Conformable seam tape used to join adjacent lengths of Elastowrap.

TitanGrip Waterproof Tape catalog illustration

TitanGrip Waterproof Tape

Grip tape for flashing, patches, penetrations and vapor barriers. The legacy catalog lists three- and four-inch widths.

TitanVent Self-Tapping Roof Vent catalog illustration

TitanVent Self-Tapping Roof Vent

A vent fitted into the membrane assembly. Ventilation requirements depend on the enclosure.

TitanClip Roofing Clips catalog illustration

TitanClip Roofing Clips

Reusable brackets for securing furring strips at an appropriate fascia attachment point.

Product images are catalog references. Contractors and distributors can request current selection, pricing and specification sheets.

Contractor field briefing

Prepare for the site assessment.

Restoration teams can use the roof demonstration to review the sequence with a project manager. Bring the site address, roof photographs, access restrictions and anticipated repair schedule to the conversation.

Why Titanium Tarps

Supply, reach and the installation system.

Film supply

Coordinate the required roll sizes and material quantities before mobilization.

Field logistics

Plan how crews and material will reach the damaged site.

A fitted system

Review membrane, seams, vents and perimeter details together.

Stadium construction wall and temporary membrane enclosure
Stadium construction · perimeter enclosure

The construction division

Wrap the tower. Protect the schedule.

General contractors and developers use temporary enclosure for open floor plates, delayed glazing, deck protection and debris containment.

  • Open floor and façade weather enclosure
  • Protection for active interior trades during glazing delays
  • Containment coordinated with screening and netting
Talk to the construction team

Government and institutional

Protect the facility. Document the work.

Government, municipal and institutional facilities may require secure access, phased work and photographs for procurement and project records.

Covered Florida Coast Guard facility roof
Florida Coast Guard facility · project archive
Government contractor information
Scaffolding around an industrial structure on the waterBefore

Interior protection · Miami

Floating ceilings, debris and dust containment.

The crew suspended a membrane over a hotel atrium during renovation. The footage looks up through the occupied building and across the suspended surface.

  • Overhead debris containment
  • Atrium and lobby enclosures
  • Separation of occupied areas from a work zone
Enclose an interior space
Miami atrium · original silent project video

Where we work

Wherever the storm goes.

The operation is based in Miami. Ask the team to confirm local access, logistics and crew availability for your site.

  • United States
  • Canada
  • Mexico and Central America
  • South America
  • Caribbean islands
  • Bahamas and Atlantic islands

Field logistics

By jet, plane, boat and Chinook.

Historic field photographs show four ways crews and materials have traveled. Select a photograph to follow the trip.

Crew carrying material beside a chartered jetJet

What we protect

Your project. Your equipment.
Your business. Your home.

Scaffolding · The transformation

Before. During. Protected.

Follow the waterfront structure from open scaffolding through installation to the final enclosure.

Open scaffolding at the waterfront site.
BeforeOpen scaffolding at the waterfront site.
Membrane extends around the scaffold while the upper section remains open.
DuringMembrane extends around the scaffold while the upper section remains open.
The completed white enclosure surrounds the work area.
AfterThe completed white enclosure surrounds the work area.

Original project photography · Titanium Tarps / Structural Wrap team experience.

Membrane around stadium seating and active construction cranes

Project spotlight · Inter Miami CF Stadium

Protection on a bigger stage.

Temporary enclosure around the stands during stadium construction.

Project gallery

From warehouses to stadiums.

Open a photograph to view the commercial, industrial and institutional project archive.

1 / 18 · Riverside church · Destrehan, LA

Behind the response · Sanibel

From the field.

Storm damage, the crew’s journey and the protected roof. This archive edit preserves the field film’s original soundtrack and closing roof views.

Read the film description

Two men approach the coast by boat. The camera passes damaged homes, shops, sand-covered streets and stranded vessels. A group meets outdoors, then passengers ride aboard a Chinook helicopter. Aerial views trace completed white coverings across the property before the Titanium Tarps closing card.

Sanibel response · 1 min 31 sec · archival footage, revised edit

Questions after a storm

Commercial roofs and failing tile.

Historic church with a temporary white covering
Are blue tarps good enough for a commercial or industrial roof?

The opening, access, expected repair schedule and local exposure determine the appropriate temporary measure. A field assessment helps compare a short-term tarp with a fitted covering.

What is stretch wrap roofing?

Elastowrap is a tensioned membrane fitted over an existing structure or temporary support system. Crews plan the seams, perimeter attachment and drainage around the building.

Can you cover a large roof while we wait on replacement tile?

Yes. Clay, slate and custom tile projects can need temporary coverage while matching material is ordered. Share the roof plans, roof condition and expected delivery date.

Do you work on government and institutional buildings?

The field archive includes government facilities, schools, churches and a municipal building. For a procurement inquiry, identify the agency, site requirements and documentation needed.

How long does a stretch wrap roof last?

Ask for the current product data sheet and project-specific inspection, maintenance and warranty terms. Expected exposure and the condition of the structure affect the scope.

Do you work with insurance claims?

The team can document visible conditions and the installed covering with photographs. Policy coverage and payment decisions belong to the carrier and policyholder.

How fast can you mobilize a large commercial roof?

Call with the building address, roof condition and access restrictions. The team can confirm crew availability, material and a site-specific timeline.

Rapid response

Get a crew and a quote.

Contact Marcelo Romero’s operations team with the building location, damage and timeline.

Project inquiries

Tell us about
your roof.

For immediate assistance, call the team for your project.

305-434-0444info@titarps.com